Contact (s) : Rocky Yao
Numéro de téléphone : +8613801785300
WhatsApp : 8613801785300
March 05, 2021
Recently, more than a dozen small /medium crawler cranes of XCMG have launched a cluster attack and launched a full range of fire, effectively assisting the construction of "the world's first multi tower cable-stayed bridge on the same floor of highway and railway" - Jinhai bridge project of Zhuhai Airport intercity railway.
Speeding up the speed of "new infrastructure construction"
Since the assembly call of "new infrastructure", Zhuhai, Guangdong Province has made great efforts to drive to a brand-new track. Many major projects have been launched one after another, focusing on "seizing the beach of new infrastructure". Among them, Jinhai bridge has attracted much attention.
As a key project in Guangdong Province and a key and difficult control project of Zhuhai Jinan intercity rail transit project, Jinhai bridge, with a total length of about 11.2 km, is an important channel connecting the East and West urban areas of Zhuhai and the first dual-purpose highway and rail bridge erected at the estuary of the Pearl River.
It is reported that after the completion of the bridge in 2023, the intercity trains between Zhuhai and Jinan will go hand in hand with cars to run on the bridge and cross the mountain and sea. This will greatly reduce the existing traffic pressure, effectively improve the travel experience of the public, further consolidate the solid foundation of Zhuhai's "new infrastructure", and show the "Zhuhai speed" to the world.
High quality and high efficiency show strength and win praise
"The construction of the project is basically carried out on the bridge. Considering the limitation of working space and the actual demand of hoisting, we selected a batch of crawler cranes of 75 ~ 130 tons. Of course, this batch of equipment belongs to XCMG. "The relevant person in charge of China Railway Bridge Bureau, the construction unit of the project, said.
“Powerful, flexible and reliable” XCMG medium/small tonnage crawler crane,With the obvious advantages of safety, practicality and efficiency, it has been widely praised in the field of national infrastructure.
LKING STEEL LIMITED, as the most important Strategic partners and supplier, we offered high quality and high performance wire rope to XCMG.
Here is some reference for XCMG crawler crane wire rope Model
Item | XCMG mobile crane model | XCMG crane wire rope specification | Length (m) |
1 | QY8D | 6×29Fi+FC-10-1960 | 120 |
2 | QY12 | 6×19W +FC-141870 | 120 |
3 | QY16K | 4V39S +5FC14-1870 | 145/70 |
4 | QY25K | 4V39S+5FC-14-1870 | 155/90 |
QY25K5 | 4V39S+5FC-14-1870 | 165/95 | |
5 | QY25E | 6×19W+FC-16-1870 | 145/85 |
6 | QY20 | 6×19W+FC-16-1870 | 150/80 |
7 | QY20B | 6×19W+FC-16-1870 | 150/85 |
8 | QY25Ai | 6×25Fi+FC-17-1870 | 145/85 |
9 | QY35K | 4V39S+5FC-18-1870 | 150/115 |
10 | QY50K | 4V39S+5FC-18-1870 | 180/120 |
11 | QY65K | 4V39S+5FC-20-1870 | 185 |
12 | QY65K | 4V39S+5FC-18-1870 | 125 |
13 | QY80 | 4V39S+5FC-22-1870 | 232/160 |
14 | QY100 | 4V39S+5FC-22-1870 | 245/160 |
15 | QUY50 | 35W×7+FC-18-1870 | 215 |
16 | QUY50 | 6×29Fi+FC-18-1910 | 160 |
6-strand regular lay rope, suited as a crowd rope for rotary drilling rigs.6 x K36WS – IWRC(K) Tower Crane Steel Wire Rope for Rotary Drilling Rig has outer compacted wires structure and solid polymer-filled wire rope core.Wire rope in which the free internal spaces are filled with a solid polymer that extends to, or slightly beyond, the outer circumference of the wire rope,this makes wire rope better quality,super compact structure,reduce the contact of inner wires with outer wires,and make a long service life.You got up to your payment.
Feature:
Six compacted strands.
Non-rotating.
Optional plastic encapsulated core.
Excellent crush resistant.
Application: container crane, tower crane, boom crane, unloader crane, dockside cranes, offshore crane and overhead crane.
Nominal Diameter | Approximate Mass | 1770 Mpa(MBL) | 1960 Mpa (MBL) | 2160 Mpa (MBL) |
[mm] | [kg/m] | [kN] | [kN] | [kN] |
---|---|---|---|---|
12 | 0.683 | 112 | 124 | 131 |
13 | 0.792 | 131 | 147 | 157 |
14 | 0.930 | 153 | 169 | 183 |
15 | 1.06 | 176 | 194 | 208 |
16 | 1.19 | 198 | 219 | 237 |
18 | 1.52 | 250 | 277 | 298 |
19 | 1.68 | 275 | 305 | 329 |
20 | 1.85 | 307 | 340 | 368 |
22 | 2.26 | 370 | 410 | 441 |
24 | 2.74 | 447 | 492 | 540 |
25 | 2.93 | 481 | 532 | 576 |
26 | 3.14 | 520 | 581 | 622 |
28 | 3.68 | 604 | 663 | 722 |
30 | 4.21 | 689 | 763 | 831 |
32 | 4.75 | 777 | 861 | 949 |
34 | 5.45 | 891 | 980 | 1070 |
35 | 5.71 | 933 | 1033 | 1131 |
36 | 6.09 | 992 | 1099 | 1192 |
Saisissez votre message